A cold room is only as good as its design. Panel thickness, cooling capacity, and backup power dictate whether your stock stays preserved or your power bill climbs.
Based in Kamakis, Eastern Bypass, Shred Designs builds walk-in cold rooms, freezer rooms, blast freezers, and refrigerated storage for food processors, butcheries, hotels, and institutions across Kiambu County and Nairobi. If your system is failing, see Commercial Refrigeration & Cold Room Repair.
We also supply and install split, cassette, ducted, and multi-split AC units surveyed to actual heat load. For large-scale plants, see Commercial & Industrial HVAC.
Walk-in rooms held between 0°C and +8°C for dairy, beverages, meat, fruit, vegetables and flowers, built from insulated panels.
Low-temperature rooms held at −18°C and below with thicker panels, insulated floors, heated door frames and defrost systems.
Rapid freezing rooms that bring product down to −35°C and below in hours, for meat, fish and prepared foods.
PUF or PIR panels in the thickness your temperature needs, with cam-lock joints, sealed floors, doors and fittings.
Condensing units, evaporators, expansion valves and copper pipework sized to the room load, with oil and gas managed for the duty.
Electronic controllers, high-temperature alarms and temperature logging so a fault is seen before the stock is lost.
|
Product stored |
Typical temperature |
Usual panel thickness |
|
Milk, dairy and beverages |
+2°C to +4°C |
75–100 mm |
|
Fresh meat and fish |
0°C to +2°C |
100 mm |
|
Fruit, vegetables and flowers |
+4°C to +12°C, depending on the crop |
75–100 mm |
|
Frozen food |
−18°C to −22°C |
100–150 mm |
|
Ice cream and deep-frozen product |
−25°C to −30°C |
150 mm |
|
Blast freezing |
−35°C and below |
150 mm |
These are typical figures for planning. Final set-points depend on your product, the regulator and your customer’s specification.
We design so that one failure does not ruin the stock: high-temperature alarms, phase-failure protection and, where the load justifies it, a standby unit or generator changeover. After handover, a scheduled service plan keeps the plant in condition: see HVAC maintenance contracts.
Food processors and distributors in Tatu City and Thika, butcheries and supermarkets, hotels and restaurants, dairies and milk-collection points, produce and flower handlers, beverage distributors, and institutions such as schools and hospitals. Where the project also needs building cooling or process cooling, we coordinate it with our Commercial & Industrial HVAC team.
If you only need panels, doors, copper pipe or refrigeration components, see Industrial & Technical Supplies. For bespoke frames, racking or steel work around the room, see Mechanical Engineering & Fabrication.
|
Shred Designs tip Tell us what you store, how much arrives each day and at what temperature. Loading warm product is the biggest single factor in how large the refrigeration unit must be, and it is the detail most often left out of a first enquiry. |
Related services
How much does a cold room cost?
It depends on size, temperature, panel thickness, the refrigeration unit and the electrical works. We quote after we have your brief and the site details, and the quote itemises each part.
How long does it take to build a cold room?
A small walk-in chiller can be built in days once the site is ready. Larger rooms and freezer rooms take longer because of floor, electrical and commissioning work. We give a programme with the quote.
What size of condensing unit do I need?
It is set by the cooling load, not the room volume alone. We calculate product load, heat through the walls, door openings and equipment, and select the unit with margin for your ambient conditions.
Can one room be used as both chiller and freezer?
Not reliably. A freezer room needs thicker panels, an insulated floor and a low-temperature refrigeration system. We design each room for its duty, though a room can often be upgraded at planning stage.
Does a cold room need three-phase power?
Small rooms can run on single-phase. Larger units and freezer rooms usually need three-phase. We confirm this during the survey.
Do you build outside Kiambu and Nairobi?
We build from our Kamakis base across Kiambu County and Nairobi, and take larger projects elsewhere on request.
|
Plan your cold room Tell us what you store and how much, and we will arrange a site visit and quote. Request a quote | Call 0704 879 675 | info@shreddesigns.co.ke Shred Designs Limited, Pemwa Building, Kamakis, along Eastern Bypass |